Complete Technical Documentation for Permits and Approvals

We prepare all technical documentation and drawings required to obtain specialist permits and approvals for infrastructure, civil construction and industrial development projects.

Permit Documentation Tailored to Your Project

Obtaining permits and approvals is a critical stage in any infrastructure, utility or construction project. Every authority has specific technical and legal requirements, and an incomplete file can lead to delays or even rejection.

The Dromcons team prepares complete technical documentation for permits and approvals, in full compliance with current legislation and the requirements of each institution: water and sewer utilities, electricity, gas, telecommunications, county and national roads, local authorities, environmental agencies and urban planning institutions.

We manage the entire workflow – from analysis and site plans to technical reports and document submission – so your project can move forward efficiently and with confidence.

What Permit Documentation Includes

Requirements Analysis and Identification of Necessary Approvals

We start from the project type, site conditions and applicable regulations to establish the complete list of permits and approvals required.

  • Review of existing documentation such as urban plans, technical studies and previous designs.
  • Identification of approving institutions: utility operators, environmental authorities, road authorities, urban planning bodies and others.
  • Preparation of a permitting strategy with deadlines, steps and clearly defined responsibilities.
  • Alignment of technical requirements with the proposed design solutions.
Dromcons engineers reviewing technical documentation required for permits

Site Plans and Location Drawings for Permits

We prepare all graphical documents required by the authorities so the project can be assessed and understood clearly from a technical perspective.

  • Existing site plan – showing existing networks, buildings and relevant site features.
  • Proposed site plan – presenting the new infrastructure solutions, proposed routes and utility connections.
  • Location plan – showing the project in relation to the road network and surrounding localities.
  • Typical longitudinal and cross sections – where required for roads, utility networks or linear engineering works.
Technical drawings and graphic documentation for permit applications

Permit Files and Communication with Authorities

We prepare the written documentation and complete permit files in a professional way, reducing the risk of clarification requests and resubmissions.

  • Technical reports, explanatory notes and specialist memoranda.
  • Presentation sheets, institution-specific forms and formal applications for permits or approvals.
  • Compilation of supporting annexes: land registry extracts, cadastral plans, council decisions, preliminary agreements and more.
  • Submission of documentation to the relevant authorities, follow-up on status and updates when required.
Dromcons team preparing complete permit and approval files

Our Process for Permit Documentation

  1. Initial discussion – we analyse the project, location, deadlines and investment goals.
  2. Document inventory – we verify which studies, plans and approvals already exist and what still needs to be prepared.
  3. Permitting strategy – we establish the list of approvals, the optimal order and the submission schedule.
  4. Preparation of plans and reports – we develop site plans, location drawings and written technical documents.
  5. Submission of files – we prepare and submit the documentation to each authority involved.
  6. Support until issuance – we respond to clarification requests, update documents and keep you informed throughout the permitting process.

Frequently Asked Questions About Permit Documentation

When do I need permit documentation?

Permit documentation is required before obtaining a building permit, when extending utility networks, for new connections, road modernisation projects or EU-funded projects where approvals are mandatory within the funding application file.

How long does the permitting process usually take?

The duration depends on the number of institutions involved and the complexity of the project. For typical local infrastructure projects, the process can take anywhere from a few weeks to several months. A major advantage of correct documentation from the beginning is that it significantly reduces clarification and resubmission times.

Can you help with only part of the permit process?

Yes. We can handle the full permitting process or only selected parts of it, such as site plans, technical reports or updating existing documentation, depending on the needs of your team and project.

Need permit documentation?

Let Us Handle the Permit Files for You

Send us details about your project, location and target timeline, and the Dromcons team will propose a clear permitting strategy together with a complete package of technical documentation.